Precision Ag Installers

Cellular Signal Testing Record

Cellular coverage decides whether RTK networks, telemetry and cloud sync work in a field.

What it is and why it matters

Cellular coverage decides whether RTK networks, telemetry and cloud sync work in a field. A signal test record shows where service is strong, weak or absent before money is spent on hardware that depends on it.

How to do it

  1. List the carriers that claim coverage on the property, and the phone or modem used for testing.
  2. Choose test points at field entrances, corners, low spots and the shop, and record GPS coordinates for each.
  3. At each point, note signal bars or, better, signal strength in dBm and the network type, such as LTE or 5G.
  4. Run a speed test and a continuous ping for one minute, and write down download, upload and dropped packets.
  5. Repeat the test at another time of day, because tower load changes speed.
  6. Map the results, circle dead zones, and decide whether a booster, external antenna or another carrier is needed.

What good looks like

For correction streams over a cellular link, steady connection matters more than speed. A few hundred kilobits per second is enough, but dropouts longer than a few seconds can end an RTK fix.

For installers and service technicians

Installers should run a signal survey before selling a cellular-dependent system, and put the results in the quote. Typical service call: the modem works in the shop but drops in the field, because the antenna sits inside a metal cab with no external mount.

  • Test with the same modem that will be installed.
  • Mount antennas high and away from metal in the cab.
  • Record carrier, signal and speed on the work order.

Handover note

When a cellular signal testing record job is finished, give the customer a short written record: what was installed or checked, the settings and values entered, the test result and the date. Photos of mounting and wiring help the next technician. Record the software and firmware versions, the serial numbers of anything replaced, and the name of the person who ran the final test. Walk the operator through the main screens and leave one number to call. Offer a follow-up visit after the first real use, so settings can be rechecked under working conditions. A clear record cuts repeat calls and makes warranty and service work faster for everyone.

General information only. Follow the manufacturer's installation instructions, applicable safety standards and local regulations for every job.

Credible references

Farm.FM reading

More farm technology stories and humor are at farm.FM Farming.