Precision Ag Installers

Equipment Section Control Test

Section control turns sprayer, planter or spreader sections on and off automatically to avoid overlap.

What it is and why it matters

Section control turns sprayer, planter or spreader sections on and off automatically to avoid overlap. A test on a known field shows whether it works as promised, and how much product it saves.

How to do it

  1. Set up the implement profile, including width, section count and the distance from the receiver to each section.
  2. Enter response time for the valves or clutches, since late shutoff causes overlap and early shutoff leaves skips.
  3. Run the machine across a mapped boundary and a previously covered strip.
  4. Mark the point where each section turns on and off, and measure error with a tape.
  5. Check headlands, point rows and waterways on the as-applied map.
  6. Adjust on and off delays, retest, and save the final values.

What good looks like

A good result keeps overlap in the range of a few feet at boundaries. Savings of about 5 to 10 percent are commonly reported on irregular fields, but the figure depends on field shape and operator habits.

For installers and service technicians

For installers, the test is the proof of a good install. Save the as-applied map from the test with the job file. Typical service call: a section does not shut off at a boundary because its valve wiring was swapped with its neighbor.

  • Record valve type and response time.
  • Photograph the section layout and wiring.
  • Retest after any controller update.

Handover note

When a equipment section control test job is finished, give the customer a short written record: what was installed or checked, the settings and values entered, the test result and the date. Photos of mounting and wiring help the next technician. Record the software and firmware versions, the serial numbers of anything replaced, and the name of the person who ran the final test. Walk the operator through the main screens and leave one number to call. Offer a follow-up visit after the first real use, so settings can be rechecked under working conditions. A clear record cuts repeat calls and makes warranty and service work faster for everyone.

General information only. Follow the manufacturer's installation instructions, applicable safety standards and local regulations for every job.

Credible references

Farm.FM reading

More farm technology stories and humor are at farm.FM Farming.